This study identified the most critical empirical risk factors at three sequential phases in a preconstruction period and investigated different perceptions of those risk factors by project owners (Korea international cooperation agency officers, KOICA) and construction managers (CM). It was found that the most prioritized empirical risk factors were evenly distributed in the three phases of the preconstruction period. Furthermore, the bidding phase of the Official Development Assistance (ODA) construction project had more high-ranking factors than the other phases; therefore, risk management in this phase needs particular attention. This study demonstrated the different perceptions of some risk factors, which are statistically significant, by various practitioners from the project owner (KOICA) and CM, on five factors based on occurrence and severity through a nonparametric test. KOICA placed higher awareness than CM on the nine critical risk factors, which are mostly technical survey and cost estimation related factors except one, which is a procurement-related factor. This study will encourage professional practitioners in KOICA ODA construction project management to enhance their risk management function based on the most critical risk factors and ensure their efficient cooperation.

목차

Abstract
Ⅰ. INTRODUCTION
Ⅱ. LITERATURE REVIEW
Ⅲ. RESEARCH METHODOLOGY
Ⅳ. DATA ANALYSIS AND FINDINGS
Ⅴ. DISCUSSION
Ⅵ. CONCLUSION
REFERENCES

참고문헌 (0)

참고문헌 신청

함께 읽어보면 좋을 논문

논문 유사도에 따라 DBpia 가 추천하는 논문입니다. 함께 보면 좋을 연관 논문을 확인해보세요!

이 논문의 저자 정보

이 논문과 함께 이용한 논문

최근 본 자료

전체보기

댓글(0)

0

UCI(KEPA) : I410-ECN-0101-2021-349-001838002